www.dnv.co.uk
our services
your industry
dnv worldwide
news & events
DNV.com
about us
contact us
find us
careers
sitemap
DNV UK Homepublicationsdnv forumby subjectnews
DNV Forum
 
 
Hybrid riser for Technip

Technip was contracted by Petrobras to carry out the engineering, procurement, construction and installation of the export riser linking the DNV-classed P-52 semi-submersible floating production unit (FPU) with PRA-1, a fixed platform. Technip appointed DNV for third-party verification of the detailed design and pre-commissioning certification, according to Brazilian regulations, of the riser and the flowline.

P-52 is located at a water depth of 1,800 m in the Roncador field in the Campos Basin, off the coast of Brazil, and is linked to a fixed platform, PRA-1, located at a water depth of 100 m. The export riser is a free-standing hybrid riser which will connect P-52 to the 18-inch, approximately 56-km-long subsea oil export pipeline system.

The riser consists of a vertical steel pipe tensioned by near-surface buoyancy with a flexible jumper connecting the top of the riser to the FPU. Using a novel concept, this is an important and challenging task for DNV, which always aims to be ahead of its competitors in the development of new technology.



25 August 2006
SEARCH
SHORTCUTS
Certification Services
Consulting services
Training Services
DNV Maritime
DNV Software
DNV Research
DNV Exchange
IT Global Services
RELATED INFO
  downloads:
Forum No. 2-2006
   
top of page

print this page

print this page
privacy statement | © 2008 det norske veritas | terms of use