our services
your installations
know-how
worldwide
DNV.com
about us
contact us
find us
careers
sitemap
DNV UK Homeenergynews
news
 
 
DNV’s Celso Raposo
Technip appointed DNV for third-party verification of the detailed design and pre-commissioning certification, according to Brazilian regulations, of the riser and the flowline.
Hybrid risers for Technip

Technip was contracted by Petrobras to carry out the engineering, procurement, construction and installation of the export riser linking the DNV-classed P-52 semi-submersible floating production unit (FPU) with PRA-1, a fixed platform. Technip appointed DNV for third-party verification of the detailed design and pre-commissioning certification, according to Brazilian regulations, of the riser and the flowline.

P-52 is located at a water depth of 1,800 m in the Roncador field in the Campos Basin, off the coast of Brazil, and is linked to a fixed platform, PRA-1, located at a water depth of 100 m. The export riser is a free-standing hybrid riser, which will connect P-52 to the 18-inch, approximately 56-km-long subsea oil export pipeline system.

The riser consists of a vertical steel pipe tensioned by near-surface buoyancy with a flexible jumper connecting the top of the riser to the FPU. Using a novel concept, this is an important and challenging task for DNV, which always aims to be ahead of its competitors in the development of new technology.



21 August 2006
SEARCH
SHORTCUTS
Handbooks on safety and reliability
DNV Offshore Codes
Find the latest issue of DNV Oil & Gas News here!
RELATED INFO
  contacts:
Celso Raposo e-mail
  downloads:
Oil & Gas News No. 2 2006
   
top of page

print this page

print this page
privacy statement | © 2008 det norske veritas | terms of use
 
       

 

 

 

>>